Jump to content

EC-120B collective lever failure


Recommended Posts

On February 4, 2004 an EC-120B s/n 1009 built in 1998 registered in Switzerland suffered a rupture of the right collective pitch lever while on the ground. The lever broke around a small crack around the base. The Manufacturer has not deemed necessary to provided any alert bulletin until now and this seems rather strange for such an important piece of equipment like the flight controls. java script:emoticon('???')Has anyone had, or does anyone now of a similar failure or crack on the EC-120B collective lever?

I hardly recommend any Colibri operator to check the collective pitch lever for cracks around the base. (And maybe to ask Eurocopter for answers to a rather embarrassing question...).  pictures available on request

Link to comment
Share on other sites

  • 1 year later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...