Jump to content

Recommended Posts

Posted

Up loaded for me ok, I am the one that things dont work for

Thats more like it could not open the Apache vid.

Was begining to think things were going my way.

  • 2 weeks later...
Posted

Awesome! How much time do you need to do utility work for TEMSCO? Do you still need to do the tours in the 350 before you fly the 500 if you have some lift experience?

Posted
Awesome! How much time do you need to do utility work for TEMSCO? Do you still need to do the tours in the 350 before you fly the 500 if you have some lift experience?

 

1,500 hrs minimum with external load time for the utility. They will hire you for the 500 contracts without the Astar time if there is a 500 contract opening.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...